Our Phase II Renovations are in development with the hopes of starting construction this summer (2025). We will be adding a choir loft and a new bell tower with an electronic tolling system. The organ will be re-installed in the choir loft. An additional meeting room and some storage will also be included in the choir loft. The Gathering Area will be updated, bathrooms will be moved and renovated, and the 24-hour Chapel will get a face-lift. The pews will be replaced. So, many great things will be included! Look at the top of this page to see the beautiful artistic rendering of the front facade of the church!
Check out the brochure below and hear from Father Terry about this wonderful, next phase of the long-awaited church renovation.
Our goal is $3,500,000.00. This includes all of the beautiful aspects mentioned above. We also have included the 39th Annual Bishop's Appeal goal. This fall you will not be contacted for pledging to the Bishop's annual appeal. However, this is for this year only. Fall 2026 and Fall 2027 are NOT included in our capital campaign and those appeals will happen as normal at those times.